ENGINE UNIT > INSTALLATION |
| 1. INSTALL DRIVE SHAFT BEARING BRACKET |
![]() |
Install the drive shaft bearing bracket with the 2 bolts.
| 2. INSTALL WIRING HARNESS CLAMP BRACKET |
![]() |
Install the wiring harness clamp bracket with the bolt.
| 3. INSTALL WATER FILLER ASSEMBLY |
![]() |
Install the water filler assembly with the bolt.
| 4. INSTALL NO. 2 VENTILATION HOSE |
![]() |
Install the No. 2 ventilation hose with the clip.
| 5. INSTALL OIL LEVEL DIPSTICK GUIDE SUB-ASSEMBLY |
![]() |
Install the new O-ring to the oil level dipstick guide sub-assembly.
![]() |
Install the oil level dipstick guide sub-assembly with the bolt.
| 6. INSTALL OIL LEVEL DIPSTICK SUB-ASSEMBLY |
| 7. INSTALL IDLER PULLEY |
![]() |
Install the idler pulley with the 3 bolts.
| 8. INSTALL ENGINE WIRE |
![]() |
Install the engine wire with the 4 bolts.
Connect all the connectors and the harness clamps.
| 9. INSTALL VACUUM SWITCHING VALVE ASSEMBLY |
![]() |
Install the vacuum switching valve assembly with the bolt.
Connect the vacuum switching valve assembly connector.
| 10. INSTALL NO. 2 RADIATOR HOSE |
![]() |
Install the No. 2 radiator hose with the clip.
| 11. INSTALL NO. 1 IGNITION COIL |
![]() |
Install the 3 No. 1 ignition coils with the 3 bolts.
Connect the 3 No. 1 ignition coil connectors.
| 12. INSTALL NO. 1 RADIATOR HOSE |
![]() |
Install the No. 1 radiator hose with the 2 clips.
| 13. INSTALL WATER BY-PASS HOSE ASSEMBLY |
![]() |
Install the water by-pass hose assembly with the 2 clips.
| 14. INSTALL INJECTOR VIBRATION INSULATOR |
![]() |
Install 3 new injector vibration insulators to the cylinder head.
| 15. INSTALL FUEL INJECTOR ASSEMBLY |
![]() |
Apply a light coat of gasoline or spindle oil to the contact surfaces of a new O-ring, and install it onto the injector.
| *1 | O-ring |
![]() |
While turning the fuel injector assembly left and right, install it onto the fuel delivery pipe.
| 16. INSTALL FUEL PIPE INSULATOR |
![]() |
Install the 2 fuel pipe insulators onto the fuel delivery pipe.
| 17. INSTALL FUEL DELIVERY PIPE |
![]() |
Install the fuel delivery pipe with the 2 bolts.
![]() |
Connect the 3 fuel injector assembly connectors.
![]() |
Engage the 3 harness clamps and connect the 3 connectors.
| 18. INSTALL EGR VALVE ASSEMBLY |
![]() |
Install a new gasket to the cylinder head.
Insert the EGR valve into the stud bolt, rotate the EGR valve to avoid contact with the delivery pipe, and temporarily install the EGR valve.
![]() |
Connect the water by-pass hose.
Connect the EGR valve connector.
| 19. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR |
![]() |
Temporarily install the intake manifold insulator with a new gasket, the 2 bolts and the nut.
| 20. INSTALL INTAKE MANIFOLD |
![]() |
Install the new gasket onto the intake manifold.
![]() |
Install the intake manifold with the 2 bolts and 2 nuts in the order shown in the illustration.
![]() |
Connect the vacuum hose, ventilation hose and install the 2 bolts.
Connect the 2 connectors and 4 harness clamps.
| 21. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY |
![]() |
Install the new gasket onto the intake manifold.
![]() |
Install the throttle with motor body assembly with the 3 bolts and nut.
Connect the throttle with motor body assembly connector.
![]() |
Connect the 2 water by-pass hoses with the 2 clips.
Install the 2 water by-pass hoses to the hose clamp.
| 22. INSTALL GENERATOR ASSEMBLY |
![]() |
Temporarily install the generator assembly with the bolt.
![]() |
Temporarily install the fan belt adjusting bar with bolt A and bolt B.
Tighten bolt B with the generator assembly near the cylinder block.
![]() |
Install the 2 brackets with the 2 bolts.
![]() |
Connect the connector and wire harness clamps.
Install the terminal B with the nut.
Install the terminal cap.